logo

Kingsland Asphalt Resurfacing

Sector: Road • Location: Kingsland, Georgia, United States of America

Source: Dodge USA

Project
Closed

City of Kingsland Purchasing Department is accepting proposals from qualified vendors to construct Asphalt Resurfacing on City streets. Mill and level existing asphalt as needed.Overlay with 1.5" of 12.5 hot mix asphalt Taper asphalt on all aprons to driveways and connecting streets. Asphalt mix and tack coat application are to be completed to GDOT standards. Pavement milling for transition will b

Status
Closed
Sector
Road, Government, Commercial, Manufacturing (Industrial)
Location
Kingsland, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Kingsland Asphalt Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kingsland Asphalt Resurfacing” is an infrastructure initiative in the Road sector, located in Kingsland, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

City of Kingsland Purchasing Department is accepting proposals from qualified vendors to construct Asphalt Resurfacing on City streets. Mill and level existing asphalt as needed.Overlay with 1.5" of 12.5 hot mix asphalt Taper asphalt on all aprons to driveways and connecting streets. Asphalt mix and tack coat application are to be completed to GDOT standards. Pavement milling for transition will be required where new overlays join existing streets at Laurel Island Parkway, Georgia Hwy 40/East...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Kingsland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project