Kingsley Hill Road Roadway and Safety Improvements - Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Base Bid plus Alternate 1 scope of work includes installations of 570 linear feet of 15-inch HDPE drain pipe, 21 drainage structures, 5,000 square yards of road reconstruction, 730 square yards of grassed swale, 2,230 linear feet of bituminous curb, 1,860 linear feet of steel highway guard rail and associated work.
- Status
- Prospective
- Sector
- Steel, Rail, Road, Bridge, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Monroe Bridge, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kingsley Hill Road Roadway and Safety Improvements - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Base Bid plus Alternate 1 scope of work includes installations of 570 linear feet of 15-inch HDPE drain pipe, 21 drainage structures, 5,000 square yards of road reconstruction, 730 square yards of grassed swale, 2,230 linear feet of bituminous curb, 1,860 linear feet of steel highway guard rail and associated work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Monroe Bridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Rail, Road, Bridge, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
