logo

Kingston Landfill Solar Array Project

Sector: Power Generation (CCGT) • Location: Kingston, New Hampshire, United States

Source: Citizen Portal AI

Project
Planned

Revision Energy proposed a solar array project for the town landfill in Kingston, New Hampshire. The design includes a roughly 4 megawatt AC (just under 5 megawatt DC) solar array covering suitable portions of the capped landfill, with about 88,100 solar panels. The project requires state permits and utility interconnection studies, with expected lease payments to the town and owner-investors cove

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Government
Location
Kingston, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Citizen Portal AI

ConstructChat

Ask ConstructChat about Kingston Landfill Solar Array Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kingston Landfill Solar Array Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kingston, New Hampshire, United States. Taiyo aggregates data on it from Citizen Portal AI.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Revision Energy proposed a solar array project for the town landfill in Kingston, New Hampshire. The design includes a roughly 4 megawatt AC (just under 5 megawatt DC) solar array covering suitable portions of the capped landfill, with about 88,100 solar panels. The project requires state permits and utility interconnection studies, with expected lease payments to the town and owner-investors covering utility upgrades.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Kingston

Source

Source

Citizen Portal AI

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Government

Article published date

2025-10-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project