Kingsville SWWTP New Backup Generator & Lift Station
Sector: Water Supply and Storage • Location: Kingsville, Texas, United States of America
Source: Dodge
The SWWTP is expected to hit the 90% TCEQ trigger by 2027, at which time construction of an expansion should commence. The facilities include the plant-wide power and electrical equipment. This equipment has been on the plant staff's priority list due to age and obsolescence. These facilities can all be replaced with newer equipment sized for expansion. Critical equipment and other treatment facil
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Kingsville, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kingsville SWWTP New Backup Generator & Lift Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The SWWTP is expected to hit the 90% TCEQ trigger by 2027, at which time construction of an expansion should commence. The facilities include the plant-wide power and electrical equipment. This equipment has been on the plant staff's priority list due to age and obsolescence. These facilities can all be replaced with newer equipment sized for expansion. Critical equipment and other treatment facilities must be rehabilitated and/or expanded to meet future flows and follow the TCEQ 90% trigger ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Kingsville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
