logo

Kinshasa solar plant

Sector: Solar • Location: Congo, Dem. Rep.

Source: World Bank Group

Project
Active

The project entails the construction of Kinshasa solar plant in Menkao district, Maluku municipality, Kinshasa. The solar plant is part of the 1 GW mega project Kinshasa solar city. The sponsor of the 600 MW plant is american Sandi group through its subsidiary Sun Plus. Total project cost is $ 600 million. No information regarding the equity and debt is provided. The signed PPA is for 25 years. Co

Status
Prospective
Sector
Solar, Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kinshasa solar plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kinshasa solar plant” is an infrastructure initiative in the Solar sector, located in Congo, Dem. Rep.. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of Kinshasa solar plant in Menkao district, Maluku municipality, Kinshasa. The solar plant is part of the 1 GW mega project Kinshasa solar city. The sponsor of the 600 MW plant is american Sandi group through its subsidiary Sun Plus. Total project cost is $ 600 million. No information regarding the equity and debt is provided. The signed PPA is for 25 years. Construction began on the 24th August 2020. https://ijglobal.com/data/transaction/52439?name=Kinshaha%20Solar%20PV%20Plant%20(600MW)&link=%2Farticles%2F149638%2Fppa-signed-for-utility-scale-solar-in-drc

Original sector

Energy

Budget

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project