logo

Kipper 1B Project

Sector: Production • Location: Victoria, Australia

Source: Rigzone

Project
Planned

The Kipper 1B project will develop an additional well to increase gas production in the Kipper field offshore Australia, providing much-needed gas supply for the domestic market ahead of winter 2026. The project includes significant upgrades to the West Tuna platform and is set to start drilling later this year.

Status
Prospective
Sector
Production
Location
Victoria, Australia
Updated
22 Jul 2026
Source
Rigzone

ConstructChat

Ask ConstructChat about Kipper 1B Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kipper 1B Project” is an infrastructure initiative in the Production sector, located in Victoria, Australia. Taiyo aggregates data on it from Rigzone.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kipper 1B project will develop an additional well to increase gas production in the Kipper field offshore Australia, providing much-needed gas supply for the domestic market ahead of winter 2026. The project includes significant upgrades to the West Tuna platform and is set to start drilling later this year.

Original sector

Production

Budget

Location

Country

Australia

State

Victoria

Source

Source

Rigzone

URL

More Details

Record type

Project

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project