Kirby North Central Processing Facility Connection
Sector: Power Generation (CCGT) • Location: Conklin, Alberta, Canada
Source: Dodge USA
Connection of Canadian Natural's proposed 789BL transmission line to electric system by connecting it to AltaLink's existing 789L transmission line - 5 new structures (2 new steel structures with airbreaks and 2 wood H-frame structures and 1 tap structure) - Possible removal of 1 transmission structure - Approximately 270 metres of conductor (wire)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice of completion |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Connection of Canadian Natural's proposed 789BL transmission line to electric system by connecting it to AltaLink's existing 789L transmission line - 5 new structures (2 new steel structures with airbreaks and 2 wood H-frame structures and 1 tap structure) - Possible removal of 1 transmission structure - Approximately 270 metres of conductor (wire) |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
