Kircher Park Playground Resurfacing
Bidding · Missouri · Last reported Nov 2024
Source: Dodge USA
A. Removal of existing poured-in-place surfacing. B. Preparation and cleanup of existing concrete base as required for manufacturer recommended installation of new poured-in-place surfacing. C. Poured-in-place resilient play surfacing on existing concrete base. D. Installation and warranty for surfacing and other work performed. E. Include all necessary product and warranty information F. Itemized
- Status
- Prospective
- Sector
- Road, Commercial, Car parking, Manufacturing (Industrial), Automotive, Cement, Government
- Location
- Eureka, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kircher Park Playground Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. Removal of existing poured-in-place surfacing. B. Preparation and cleanup of existing concrete base as required for manufacturer recommended installation of new poured-in-place surfacing. C. Poured-in-place resilient play surfacing on existing concrete base. D. Installation and warranty for surfacing and other work performed. E. Include all necessary product and warranty information F. Itemized bid for the above-mentioned items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Eureka |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Car parking, Manufacturing (Industrial), Automotive, Cement, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
