logo

Kiribati Grid Connected Solar PV Project

Sector: Solar • Location: Kiribati

Source: World Bank Group

Project
Closed

The objective of the Grid Connected Solar Photovoltaic (PV) Project for Kiribati is to contribute to reducing Kiribati's dependence on imported petroleum for power generation in order to improve energy security and to reduce the greenhouse gas (GHG) emissions from diesel fuel use for grid electricity supply in Kiribati. The project has three components. The first component is investment in grid co

Project Information FAQ

Project Information

5 Q
The project “Kiribati Grid Connected Solar PV Project” is an infrastructure initiative in the Solar sector, located in Kiribati. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Grid Connected Solar Photovoltaic (PV) Project for Kiribati is to contribute to reducing Kiribati's dependence on imported petroleum for power generation in order to improve energy security and to reduce the greenhouse gas (GHG) emissions from diesel fuel use for grid electricity supply in Kiribati. The project has three components. The first component is investment in grid connected solar photovoltaic equipment. This component will support the project implementing entity to invest in 516 kilowatt peak capacity of grid connected solar photovoltaic without storage, to kick-start a staged implementation strategy over the medium term, installed and managed at technically suitable locations as approved by the Government of Kiribati that have been identified with associated inverters to enable grid in-feed at each location. The second component is maintenance program and capacity building. It will support the project implementing entity to implement the investment through a design, supply and install contract for the solar photovoltaic installation with operations and maintenance provisions to cover the entire project implementation, and to gain experience in operations and maintenance and build capacity to initiate and manage future investments. The third component is project management. This component will support the recipient to effectively manage the fiduciary aspects of the project (including procurement and financial management) through the central fiduciary unit. It will also support the project implementing entity to effectively manage the technical aspects of the project through its project support team.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data