Kirie - Egan Solids Pipeline Rehabilitation Sec 1
Sector: Water Supply and Storage • Location: Schaumburg, Illinois, United States of America
Source: Dodge
Project consists of 2,705 feet of 18-Inch diameter sewer, rehabilitation of four (4) structures, removal and replacement of existing piping and values in four (4) structures, rehabilitation of existing temporary access route, sewer cleaning and surface restoration work.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Schaumburg, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kirie - Egan Solids Pipeline Rehabilitation Sec 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of 2,705 feet of 18-Inch diameter sewer, rehabilitation of four (4) structures, removal and replacement of existing piping and values in four (4) structures, rehabilitation of existing temporary access route, sewer cleaning and surface restoration work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Schaumburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
