Kirishi Rouble Loan
One of 3,641 projects Taiyo tracks in Russia.
Source: European Bank for Reconstruction and Development (EBRD)
Translated version of this PSD: Russian The EBRD is considering a 5-year local currency loan to OJSC Ruscam-Kirishi, one of 5 Russian subsidiaries of the Turkish glass packaging manufacturer Anadolu Cam, in order to finance the Company’s increased working capital needs. at its glass packaging plant in Kirishi (near St. Petersburg). The project is expected to contribute to demonstration of new proc
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Residential, Government
- Location
- Russia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Kirishi Rouble Loan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Translated version of this PSD: Russian The EBRD is considering a 5-year local currency loan to OJSC Ruscam-Kirishi, one of 5 Russian subsidiaries of the Turkish glass packaging manufacturer Anadolu Cam, in order to finance the Company’s increased working capital needs. at its glass packaging plant in Kirishi (near St. Petersburg). The project is expected to contribute to demonstration of new processes (i.e. environmental techniques), market expansion and forward linkages, whilst fostering a more competitive market. In addition, the Project will entail setting standards of corporate governance and business conduct which should have also have a positive demonstration effect on other market participants. OJSC “Ruscam Kirishi”. Up to RUB 480 million (EUR 12 million equivalent) EUR 65 million. Categorised B in accordance with the EBRD Environmental and Social Policy 2008. The environmental and social due diligence is under way and will focus on updating the investigations that were undertaken for the EBRD's existing project with the Company in 2008 so as to address the full scope of the EBRD Performance Requirements (PRs) relevant to the Company's operations. Environmental and social impacts from the operation of container glass facilities are limited mainly to air emissions and wastewater discharges, and can readily be identified, assessed and mitigated. The due diligence undertaken in 2008 confirmed that the existing operations are in compliance with National environmental standards and that the planned investment programme is structured to meet National and EU environmental standards. Although, the proposed investment programme is structured to meet EU environmental standards, some of the existing operations would not fully meet Best Available Techniques (BAT) as included in the EU IPPC BREF Note for new plants, notably in terms of NOx emissions. This issue was assessed further as part of the due diligence in 2008, and the measures planned by the Company, such as the use of low NOx burners and primary measure, and considering the the location of the Kirishi plant will not result in material adverse environmental and/or public health impact. In addition, the Company will install Electrostatic Precipitators (ESPs) so as to limit dust emissions and in line with BAT requirements. Based on the environmental and social due diligence, the Environmental and Social Action Plan (ESAP) agreed in 2008 will be updated and amended to ensure the Company will implement the project in compliance with EBRD PRs. The ESAP is likely to include improved management of raw material supply and contractors as well as development of a stakeholder engagement plan. These would be additional to the existing ESAP that includes measures such as implementation of an environmental, health and safety management systems in line with international standards as well as further measures and investments to reduce energy use as well as improve the abatement of air emissions and wastewater discharges in line with good international practice. This section will be amended upon completion of the environmental and social due diligence. None. Aytac Mutluguller Deputy CFO Turkiye Sise ve Cam Fabrikalari A.S. Is Kuleleri, Kule 3, 4 Levent, 34330 Istanbul, Turkey E-mail: amutluguller@sisecam.com |
Original sector | Food and Agribusiness |
Location
Country | Russia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Residential, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Russia
- Shtokman Natural Gas Project, Barents Sea, Russia
- Chad-Cameroon Pipeline
- Termokarstovoye Gas and Gas Condensate Field, Siberia
- Novoport Field, Yamal District
- Orenburg Oil and Gas Condensate Field
- Cherkizovo Group’s Oil Extraction Plant, Lipetsk Region
- Dzhubga – Lazarevskoye – Sochi Gas Pipeline, Black Sea
- Nord Stream Gas Pipeline (NSGP), Russia-Germany
