Kirtland AFB Fire Hydrant Relocation
Sector: Water Supply and Storage • Location: Albuquerque, New Mexico, United States of America
Source: Dodge USA
Kirtland AFB is looking to cap off a total of three fire hydrants that are out of compliance on the airfield. In addition to capping off three of the hydrants, two new fire hydrants and two new isolation valves will need to be installed near the existing water main line.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Albuquerque, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kirtland AFB Fire Hydrant Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kirtland AFB is looking to cap off a total of three fire hydrants that are out of compliance on the airfield. In addition to capping off three of the hydrants, two new fire hydrants and two new isolation valves will need to be installed near the existing water main line. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Albuquerque |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
