logo
ProjectGc Bidding-Invitation

Kitchen Replacements Phase II

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge USA

1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1 Scope Project Description: Remove existing kitchen cabinets & backsplashes, countertops, plumbing fixtures, electrical fixtures and flooring and replace with new in occupied rental apartments. Remove and replace the interior domestic & sanitary systems 40 UNITS Remove / Replace drywall (make like new) to expose for the removal & new installation of existing domest

Status
Prospective
Sector
Water Supply and Storage, Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
Location
Niagara Falls, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Kitchen Replacements Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kitchen Replacements Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Niagara Falls, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

gc bidding-invitation

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1 Scope Project Description: Remove existing kitchen cabinets & backsplashes, countertops, plumbing fixtures, electrical fixtures and flooring and replace with new in occupied rental apartments. Remove and replace the interior domestic & sanitary systems 40 UNITS Remove / Replace drywall (make like new) to expose for the removal & new installation of existing domestic water & sanitary piping. 26 Type A kitchens, walls to be opened up above the sink, as per spec...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Niagara Falls

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial)

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project