logo
ProjectDesign Development

Kitt Solar (100 MW) & Storage (400MWh)

Sector: Solar • Location: Eloy, Arizona, United States of America

Source: Dodge USA

100 megawatt solar with 400 megawatt hour battery energy storage system across 640 acres. Will interconnect at the Arizona Public Services Milligan Substation.

Status
Prospective
Sector
Solar, Consumer Products, Raw Materials, Power Generation (CCGT), Commercial, Energy Storage
Location
Eloy, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Kitt Solar (100 MW) & Storage (400MWh)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kitt Solar (100 MW) & Storage (400MWh)” is an infrastructure initiative in the Solar sector, located in Eloy, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

100 megawatt solar with 400 megawatt hour battery energy storage system across 640 acres. Will interconnect at the Arizona Public Services Milligan Substation.

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Eloy

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Solar, Consumer Products, Raw Materials, Power Generation (CCGT), Commercial, Energy Storage

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project