Kittitas County Courthouse Sidewalk Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
. The project consists of furnish-ing all labor, :materials, equip-ment, and other miscellaneous ite:ms to remove existing concrete sidewalk, concrete retaining wall, curb and gutter, pavement, and subgrade; prep subgrade, place and compact. top course, construct cement, concrete curb, gutter, and ADA compliant curb ramps; recon-struct drive approaches; :install brick sidewalk pavers and patch asp
- Status
- Closed
- Sector
- Cement, Car parking, Road, Water Supply and Storage, Automotive, Government, Commercial
- Location
- Ellensburg, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kittitas County Courthouse Sidewalk Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . The project consists of furnish-ing all labor, :materials, equip-ment, and other miscellaneous ite:ms to remove existing concrete sidewalk, concrete retaining wall, curb and gutter, pavement, and subgrade; prep subgrade, place and compact. top course, construct cement, concrete curb, gutter, and ADA compliant curb ramps; recon-struct drive approaches; :install brick sidewalk pavers and patch asphalt; install new trees, tree planters and improved irrigation; and replace existing light pole w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Ellensburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Water Supply and Storage, Automotive, Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
