Kiwira River Water Project
The owner, status and timeline of this project. A free account opens every field.
Source: IPP Media
The Kiwira River water project aims to enhance water supply in Mbeya City and Mbalizi Township by producing an additional 90 million litres of water per day. This project is part of efforts to combat water theft and vandalism of infrastructure, which have led to significant fines being collected by the Mbeya Urban Water and Sanitation Authority.
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Mbeya, Tanzania
- Updated
- 22 Jul 2026
- Source
- IPP Media
ConstructChat
Ask ConstructChat about Kiwira River Water Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kiwira River water project aims to enhance water supply in Mbeya City and Mbalizi Township by producing an additional 90 million litres of water per day. This project is part of efforts to combat water theft and vandalism of infrastructure, which have led to significant fines being collected by the Mbeya Urban Water and Sanitation Authority. |
Original sector | Water Supply |
Location
Country | Tanzania |
City | Mbeya |
Source
Source | IPP Media |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-03-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Open for FDI through a majority stake/Establishment of storage or distribution/sales outlet/Manufacture of tanks, reservoirs and containers of metal/EDCOM LIMITED
