logo
ProjectActive

KKS-Group

One of 10,000+ projects Taiyo tracks in Russian Federation.

Source: International Finance Corporation (IFC)

The project involves KKS Group (“KKS”), an independent utility providing space heating and hot water to customers in the Tula and Kemerovo regions of Russia. The project consists of: (i) improving the efficiency of existing KKS assets through capital expenditures; (ii) expanding KKS activities through acquisition and leasing of municipal heating assets; and (iii) developing and operating a combine

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Residential, Government
Location
Russia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about KKS-Group

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KKS-Group” is an infrastructure initiative in the Water Supply and Storage sector, located in Russian Federation. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves KKS Group (“KKS”), an independent utility providing space heating and hot water to customers in the Tula and Kemerovo regions of Russia. The project consists of: (i) improving the efficiency of existing KKS assets through capital expenditures; (ii) expanding KKS activities through acquisition and leasing of municipal heating assets; and (iii) developing and operating a combined heat and power plant (“CHP plant”) for an international industrial customer located in the Tula region. Currently, more than 80% of KKS heat sales is produced at the gas-fired assets, while the rest is produced at the coal-fired heat stations in Kiselevsk (Kemerovo oblast), where the use of coal is widely spread due to the geographical proximity of coal mines. The company will not increase its use of coal beyond 25% of total fuel consumption within the lifetime of the Project. IFC investment will provide a total of up to RUB 810 million (approximately US$25 million) in financing, or about 24% of the total project cost.

Original sector

V-CA - Integrated Utilities

Location

Country

Russia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Residential, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project