logo

Klahoose First Nation - Air-source Heat Pump and Roof-top Solar Photovoltaic Retrofit

Completed · British Columbia

Source: Infrastructure Canada

Project
Completed

The Multipurpose building is composed of four propane gas boilers and hydronic water system alongside twelve individual air conditioners (AC). This a very inefficient system and leads to significant operating costs - upwards to $6,000 during winter months. It is proposed to retrofit the existing Heating, Ventilation and Cooling (HVAC) infrastructure with an electric air source heat pump (ASHP). Th

Status
Closed
Sector
Water Supply and Storage, Solar, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Klahoose First Nation - Air-source Heat Pump and Roof-top Solar Photovoltaic Retrofit

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Klahoose First Nation - Air-source Heat Pump and Roof-top Solar Photovoltaic Retrofit” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Multipurpose building is composed of four propane gas boilers and hydronic water system alongside twelve individual air conditioners (AC). This a very inefficient system and leads to significant operating costs - upwards to $6,000 during winter months. It is proposed to retrofit the existing Heating, Ventilation and Cooling (HVAC) infrastructure with an electric air source heat pump (ASHP). The proposed ASHP would be capable of heating and cooling. Paired with this retrofit will be, a 70.4 kW roof-top solar photovoltaic (PV) system to displace the annual electricity consumption (kWh) through BC Hydro’s Net Metering project. The Multipurpose building is the highest-use building in community. It hosts health centre, fitness, language lab, kitchen, 300-person great room and administrative / council work space as such there are very high heating and cooling consumption patterns and costs associated with existing HVAC equipment. Currently, the HVAC system consists of four propane gas boiler and hydronic heating system alongside 12 individual AC units. Over the past 3-years, the Nation has paid approximately $27,500 and $10,300 on annual for propane and electricity. Project works include: - Pre and final design; - installation of HVAC; - installation of PV components including modules, inverters, racking, cables, anchors and controllers; - all related works.

Original sector

Ventilation Systems

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project