Klaipeda Port Project
One of 1,650 projects Taiyo tracks in Lithuania.
Source: World Bank Group
The main objectives of the Klaipeda Port Project is to strengthen the long term competitiveness of this Baltic region port, and, to improve environmental conditions, by preventing spills, improving waste reception facilities, and monitoring environmental conditions. The two main components are: 1) Investments in civil works, which will include the rehabilitation of breakwaters at the port entrance
- Status
- Closed
- Sector
- Oil and Gas, Seaport, Steel, Metal, Government
- Location
- Lithuania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Klaipeda Port Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Klaipeda Port Project is to strengthen the long term competitiveness of this Baltic region port, and, to improve environmental conditions, by preventing spills, improving waste reception facilities, and monitoring environmental conditions. The two main components are: 1) Investments in civil works, which will include the rehabilitation of breakwaters at the port entrance, through detailed investigations, and, build an extension of both the northern, and southern breakwaters, to limit wave energy from entering the port. In addition, the channel entrance will be dredged, widened, and deepened, allowing a realignment away from the oil terminal, in accordance with international agreements. Specifically designed monitoring fenders will be installed, combined with steel mooring lines. Safe maneuvers will be ensured following the installation of a wave/current monitoring system. Studies will determine the requirements for marine environment protection, and the financing of necessary equipment, and training. 2) Technical assistance will be provided, through studies to estimate the appropriate level of land lease rates, to avoid cross subsidies with harbor dues, and review lease management contracting, and procurement procedures, and, will focus on privatization practices for port services, and management. Training will be provided for port pilots on skillful navigation practices. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Lithuania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Seaport, Steel, Metal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in Lithuania
- Lithuanian Elektrenai Combined Cycle Power Plant
- Hydrogen injection into the gas network in Lithuania
- Innovative brownfield regeneration for sustainable development of cross-border regions
- Environmental accidents elimination in the Baltic Sea coastal area.
- Baltic Phytoremediation
- KAUNAS ENERGY SECTOR & MODERNISATION PROJECT
- Lithuania Railways (LG) Corridor IX Project
- AB Ekranas
