logo
ProjectClosed

Klaipeda Port Project

One of 1,650 projects Taiyo tracks in Lithuania.

Source: World Bank Group

The main objectives of the Klaipeda Port Project is to strengthen the long term competitiveness of this Baltic region port, and, to improve environmental conditions, by preventing spills, improving waste reception facilities, and monitoring environmental conditions. The two main components are: 1) Investments in civil works, which will include the rehabilitation of breakwaters at the port entrance

Status
Closed
Sector
Oil and Gas, Seaport, Steel, Metal, Government
Location
Lithuania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Klaipeda Port Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Klaipeda Port Project” is an infrastructure initiative in the Oil and Gas sector, located in Lithuania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Klaipeda Port Project is to strengthen the long term competitiveness of this Baltic region port, and, to improve environmental conditions, by preventing spills, improving waste reception facilities, and monitoring environmental conditions. The two main components are: 1) Investments in civil works, which will include the rehabilitation of breakwaters at the port entrance, through detailed investigations, and, build an extension of both the northern, and southern breakwaters, to limit wave energy from entering the port. In addition, the channel entrance will be dredged, widened, and deepened, allowing a realignment away from the oil terminal, in accordance with international agreements. Specifically designed monitoring fenders will be installed, combined with steel mooring lines. Safe maneuvers will be ensured following the installation of a wave/current monitoring system. Studies will determine the requirements for marine environment protection, and the financing of necessary equipment, and training. 2) Technical assistance will be provided, through studies to estimate the appropriate level of land lease rates, to avoid cross subsidies with harbor dues, and review lease management contracting, and procurement procedures, and, will focus on privatization practices for port services, and management. Training will be provided for port pilots on skillful navigation practices.

Original sector

FY17 - Transportation

Budget

Location

Country

Lithuania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Seaport, Steel, Metal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project