Klamath Hatchery - New Hatchery Building REBID
Sector: Water Supply and Storage • Location: Chiloquin, Oregon, United States of America
Source: Dodge USA
Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to complete the Project as more fully described in the Contract Documents, including: BASE BID: Construct replacement wood-framed hatchery building including, demolition, clearing, and grubbing, building pad construction, trench drains, foundation and wall system, roof trusses, attic fl
- Status
- Under Construction
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Steel, Raw Materials, Waste Processing and Treatment
- Location
- Chiloquin, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Klamath Hatchery - New Hatchery Building REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to complete the Project as more fully described in the Contract Documents, including: BASE BID: Construct replacement wood-framed hatchery building including, demolition, clearing, and grubbing, building pad construction, trench drains, foundation and wall system, roof trusses, attic floor framing, electrical, plumbing, HVAC; connect to existing 12 process water supply line and exi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Chiloquin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Steel, Raw Materials, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
