Klein Road Culvert Replacement
Bid results · Illinois · Last reported May 2023
Source: Dodge USA
The work is to be performed on Klein Road and is located inthe southeast quarter of Section 22, Township 40 North,Range 9E, 3rd PM of DuPage County in the City of WestChicago and Wayne Township. The net length of roadway improvements is approximately 112 feet (0.021 miles). The project includes, but is not limited to, the followingitems: the removal of the existing, corrugated metal pipeculvert an
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- West Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Klein Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work is to be performed on Klein Road and is located inthe southeast quarter of Section 22, Township 40 North,Range 9E, 3rd PM of DuPage County in the City of WestChicago and Wayne Township. The net length of roadway improvements is approximately 112 feet (0.021 miles). The project includes, but is not limited to, the followingitems: the removal of the existing, corrugated metal pipeculvert and two, cast-in-place (CIP) junction chambersand replacement with a single-cell, 6 x 3 precast con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | West Chicago |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
