K.L.SEWERAGE
Sector: Water Supply and Storage • Location: Malaysia
Source: World Bank Group
The project consists of: (i) about 52 miles of lateral sewers varying in size from 9 to 15 inches; (ii) about 16 miles of trunk sewers ranging in size from 15 to 60 inches; (iii) improvements to an existing sewage treatment plant; (iv) construction of four new pumping stations; (v) construction of three new sewage treatment facilities; and (vi) consulting services.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about K.L.SEWERAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (i) about 52 miles of lateral sewers varying in size from 9 to 15 inches; (ii) about 16 miles of trunk sewers ranging in size from 15 to 60 inches; (iii) improvements to an existing sewage treatment plant; (iv) construction of four new pumping stations; (v) construction of three new sewage treatment facilities; and (vi) consulting services. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
