KLWTD Grinder Pump Lateral Kit Upgrades
Sector: Steel • Location: Key Largo, Florida, United States of America
Source: Dodge USA
The scope of work involves removal of approximately 136 existing lateral kits and replacement with new stainless steel lateral kits. The work will include putting in fittings and piping needed to raise the valve assembly up to about 12 below grade, then install the new stainless steel valve assembly in a meter box as detailed in the project plans and specifications.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of work involves removal of approximately 136 existing lateral kits and replacement with new stainless steel lateral kits. The work will include putting in fittings and piping needed to raise the valve assembly up to about 12 below grade, then install the new stainless steel valve assembly in a meter box as detailed in the project plans and specifications. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
