KLWTD Power Conditioning & Electrical Upgrades
Sector: Power Generation (CCGT) • Location: Key Largo, Florida, United States of America
Source: Dodge USA
This work includes the installation of two voltage regulation transformers with the first being rated at 2,000 amps with 1,500 kVAs and the second rated at 400 amps with 350 kVAs that will regulate incoming voltage for the WWTP and Vac Station E respectively, installation of surge suppression devices equipped on critical systems and equipment, as well as installation of new lightning rods to enhan
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government
- Location
- Key Largo, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KLWTD Power Conditioning & Electrical Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work includes the installation of two voltage regulation transformers with the first being rated at 2,000 amps with 1,500 kVAs and the second rated at 400 amps with 350 kVAs that will regulate incoming voltage for the WWTP and Vac Station E respectively, installation of surge suppression devices equipped on critical systems and equipment, as well as installation of new lightning rods to enhance the plant s protection against lightning strikes. The installation of a new 3000A ATS in a NEM... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Key Largo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
