logo

Km 228-367 Drainage Improvements

Sector: Steel • Location: Fort Nelson, British Columbia, Canada

Source: Dodge USA

Project
Start

Work under this contract consists of, but is not limited to, supply and installation of steel pipe culverts using trenchless technologies (1050 mm diameter to 2200 mm diameter), excavation/ditching and riprap end protection, decommissioning existing CSP culverts via the placement of grout, hydraulic seeding of disturbed areas, and traffic control. The sites are located between Km 228.80 to 367.20

Status
Under Construction
Sector
Steel, Road, Water Supply and Storage, Waste Processing and Treatment, Tunnel, Metal, Commercial, Raw Materials
Location
Fort Nelson, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Km 228-367 Drainage Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Km 228-367 Drainage Improvements” is an infrastructure initiative in the Steel sector, located in Fort Nelson, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work under this contract consists of, but is not limited to, supply and installation of steel pipe culverts using trenchless technologies (1050 mm diameter to 2200 mm diameter), excavation/ditching and riprap end protection, decommissioning existing CSP culverts via the placement of grout, hydraulic seeding of disturbed areas, and traffic control. The sites are located between Km 228.80 to 367.20 of the Alaska Highway between Fort St. John and Fort Nelson, BC.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Fort Nelson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Road, Water Supply and Storage, Waste Processing and Treatment, Tunnel, Metal, Commercial, Raw Materials

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project