KN Next Office Building / SARC Architects
Closed · Last reported Apr 2023
Source: ArchDaily
An irregular plot aside from the new Keilaniemi metro station and a road junction is tackled with a polygonal floor plan. Flexible floor plans can be divided into smaller units or connected to each other with interior stairs, thus giving great freedom to create different kinds of spatial solutions.The bold approach in the façade design inserts the building into its dynamic surroundings. The unique
- Status
- Closed
- Sector
- Road, Mass Transit, Metal, Residential, Commercial, Automotive
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about KN Next Office Building / SARC Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An irregular plot aside from the new Keilaniemi metro station and a road junction is tackled with a polygonal floor plan. Flexible floor plans can be divided into smaller units or connected to each other with interior stairs, thus giving great freedom to create different kinds of spatial solutions.The bold approach in the façade design inserts the building into its dynamic surroundings. The uniqueness of the project lies in the outwards leaning walls and the faceted texture of the metal panels. These are partly perforated to provide sun protection and so enhancing the depth of the façade. The KN Next building has been designed in accordance with BREEAM level excellent. Sustainable architectural solutions and environmental values have been prioritized throughout the whole project.Text description provided by the architects.Designed by SARC Architects, KN Next is the new head office for Fiskars Group and rises to become an entrance gate to Keilaniemi, a fast-developing area ofEspooin the Helsinki metropolitan area. A 9-story office building, the lower three floors serve as entrance, exhibition area, meeting hall, restaurant, and social spaces. The upper floors contain offices, workshops, and meeting rooms. On top, there is the social private area with a gym, café, and yoga space, all connected to a wide terrace. Below the ground level are located two car decks.Floors for offices, restaurants, social spaces, and terraces offer new ways to approach the working environment. Additional floor height has been added to provide comfort with much-needed natural light in the darkest months of the year. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Mass Transit, Metal, Residential, Commercial, Automotive |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
