Knights Key Marathon Transmission Main Replacement
Sector: Steel • Location: Key West, Florida, United States of America
Source: Dodge USA
The proposed project generally consists of installation of approximately 200 LF of a 2-inch diameter and 2400 LF of a 36-inch Diameter HDPE water main (both via directional drilling), approximately 700 LF of a 30-inch diameter steel water main via open-cut, 40 LF of a 6-inch diameter PVC water main and 30 LF of a 4-inch diameter PVC water main via open cut. All construction includes all valves, fi
- Status
- Closed
- Sector
- Steel, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial
- Location
- Key West, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Knights Key Marathon Transmission Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project generally consists of installation of approximately 200 LF of a 2-inch diameter and 2400 LF of a 36-inch Diameter HDPE water main (both via directional drilling), approximately 700 LF of a 30-inch diameter steel water main via open-cut, 40 LF of a 6-inch diameter PVC water main and 30 LF of a 4-inch diameter PVC water main via open cut. All construction includes all valves, fittings, air release valves, maintenance of traffic (MOT) and restoration activities. The project ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Key West |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
