Kobiernice BESS Battery Storage Project
Sector: Energy Storage • Location: Porąbka, Silesian Voivodeship, Poland
Source: International Business Times
A grid-scale battery storage project in Porąbka, southern Poland's Silesian Voivodeship, developed as a 50-50 joint venture between Eurus Energy Europe and EDF power solutions Polska. The project will have a rated output of 120,000 kW and storage capacity of 280,000 kWh. Construction is due to begin in July 2026, with commercial operations planned for the second half of 2027.
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Power Generation (CCGT), Solar
- Location
- Porąbka, Silesian Voivodeship, Poland
- Updated
- 22 Jul 2026
- Source
- International Business Times
ConstructChat
Ask ConstructChat about Kobiernice BESS Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A grid-scale battery storage project in Porąbka, southern Poland's Silesian Voivodeship, developed as a 50-50 joint venture between Eurus Energy Europe and EDF power solutions Polska. The project will have a rated output of 120,000 kW and storage capacity of 280,000 kWh. Construction is due to begin in July 2026, with commercial operations planned for the second half of 2027. |
Original sector | Energy |
Location
Country | Poland |
State | Silesian Voivodeship |
City | Porąbka |
Source
Source | International Business Times |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Power Generation (CCGT), Solar |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Poland
- EV BATTERY GIGAFACTORY POLAND
- NORTHERN POLAND ENERGY DISTRIBUTION II
- NORTHERN POLAND ENERGY DISTRIBUTION
- Grupa Lotos Refinery Upgrade
- WESTERN POLAND ENERGY DISTRIBUTION
- GREENWAY EV CHARGING NETWORK (EDP)
- UMICORE EUROPEAN LARGE-SCALE BATTERY MATERIALS
- Cross-border co-operation intended to improve the tourist infrastructure and the cultural offer of Trzebiel and Bad Muskau
