Kodinar - Veraval Road Upgradation
Sector: Road • Location: India
Source: World Bank Group
The project entails the four laning of Kodinar to Veraval section of NH-8E from 221.61 km to 263.00 km and from km 120.900 to 121.150 of NH-8D. Agroh Kodinar Veraval Highways, a special purpose vehicle (SPV) incorporated and owned by Agroh Infrastructure Developers, has entered into concession agreement with NHAI for the design, build, finance, operate and transfer (DBFOT) of 41.75 km road projec
- Status
- Prospective
- Sector
- Road, Education, Government, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kodinar - Veraval Road Upgradation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the four laning of Kodinar to Veraval section of NH-8E from 221.61 km to 263.00 km and from km 120.900 to 121.150 of NH-8D. Agroh Kodinar Veraval Highways, a special purpose vehicle (SPV) incorporated and owned by Agroh Infrastructure Developers, has entered into concession agreement with NHAI for the design, build, finance, operate and transfer (DBFOT) of 41.75 km road project on Hybrid Annuity basis. Concession period includes construction period of 910 days from appointed date and operational period of 15 years from commercial operations date (COD). Once the concession period lapses, the project company will transfer the ownership of the project to the state. Concession contract was awarded after a competitive bidding process based on lowest cost of construction and operation. Total cost of the project is Rs.670 crore ($103 million) to be funded through debt of Rs.321.60 ($49.4 million) crore, construction grant from NHAI of Rs.268 crore ($41.2 million) and balance Rs. 80.4 crore ($12.4 million) through promoter’s contribution. Debt financing has a tenor of 17 years and 7 months provided by a pool of banks. Financial closure was reported to have occurred on 27th October 2017. CARE Ratings, WB library files https://infrastructureindia.gov.in/view-project?p_p_id=viewproject_WAR_Projectportlet&p_p_lifecycle=0&p_p_col_id=column-1&p_p_col_count=1&_viewproject_WAR_Projectportlet_jspPage=%2Fhtml%2Fviewproject%2Fview.jsp&_viewproject_WAR_Projectportlet_ppp=Government+Infrastructure+Projects+%28PPP%29&_viewproject_WAR_Projectportlet_projectId=24904&_viewproject_WAR_Projectportlet_currURL=%2Fweb%2Fguest%2Fproject-list |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Education, Government, Automotive, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
