logo

Kolkata, Salt Lake Water supply and Sewerage Project

One of 9,007 projects Taiyo tracks in Gujarat.

Source: World Bank Group

Project
Active

The Kolkata Metropolitan Development Authority (KMDA) awarded a 30 year Build Operate Transfer (BOT) project to Navodigantho Water Company (NWC), a Special Purpose Vehicle company formed by Navodigantho Industrial Township Authority (NITA), KMDA and two subsidiary companies of Tata Enterprises (India) - Jamshedpur Utilities and Services Company Limited (JUSCO) and Voltas Limited.

The scope of t

Status
Prospective
Sector
Automotive, Water Supply and Storage, Commercial, Manufacturing (Industrial), Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT)
Location
Gujarat, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kolkata, Salt Lake Water supply and Sewerage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kolkata, Salt Lake Water supply and Sewerage Project” is an infrastructure initiative in the Automotive sector, located in Gujarat, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kolkata Metropolitan Development Authority (KMDA) awarded a 30 year Build Operate Transfer (BOT) project to Navodigantho Water Company (NWC), a Special Purpose Vehicle company formed by Navodigantho Industrial Township Authority (NITA), KMDA and two subsidiary companies of Tata Enterprises (India) - Jamshedpur Utilities and Services Company Limited (JUSCO) and Voltas Limited. The scope of the project included construction, maintenance and operation of a greenfield water supply and sewerage system at Sector V, Salt Lake which is emerging as an important Information Technology hub in Kolkata city. The cost of the project is estimated at US $ 16.95 Million (Indian Rupees 678 Million). Of this, about 35% of the project cost, amounting to USD 5.93 Million (Indian Rupees 237.2 Million) has been funded through grants under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) program of Government of India. The balance 65% of the cost, totaling to about USD 11 Million (Indian Rupees 440.7 Million) will be invested by the Tata subsidiary companies-JUSCO and Voltas Limited. The land for this particular project was provided free of cost by KMDC As per the contract, NWC would create and manage a Water Supply System with a capacity to supply 13.5 Million Litres per Day (consisting of conveyance mains for treated water, pump house and underground reservoir and water supply distribution network of 16.8 km). In addition NWC would also construct and maintain a sewerage system with a capacity of 8 MLD, (consisting of a sewage collection network, sewage pumping stations and sewage treatment plant). NWC would be operating the system for a period of 30 years. While NWC will charge the users a combined water cum sewerage fee at Rs. 25/KL of water supplied, it will be purchasing bulk water supply from Kolkata Municipal Corporation at Rs. 5/KL. Nearly 80% of the customer base for NWC comprises Industrial, Commercial and Institutional (IT & IT Enabled services) customers and the rest (20%) of the water supply would be to domestic users.

Original sector

Water and sewerage

Budget

Location

Country

India

State

Gujarat

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Water Supply and Storage, Commercial, Manufacturing (Industrial), Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project