KOLUBARA B. THERMAL
Sector: Power Generation (CCGT) • Location: Yugoslavia, former
Source: World Bank Group
The objectives of the project are to: (a) meet the growth in demand for electricity in Serbia; (b) facilitate rehabilitation of aging thermal generating units in Serbia; (c) introduce a systematic air-quality monitoring and study program in the Kolubara area; and (d) improve the financial performance of Elektroprivreda of Serbia (EPS) and Elektroprivreda (EP) and strengthen their capacities in fin
- Status
- Closed
- Sector
- Power Generation (CCGT), Biomass, Geothermal, Government
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KOLUBARA B. THERMAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the project are to: (a) meet the growth in demand for electricity in Serbia; (b) facilitate rehabilitation of aging thermal generating units in Serbia; (c) introduce a systematic air-quality monitoring and study program in the Kolubara area; and (d) improve the financial performance of Elektroprivreda of Serbia (EPS) and Elektroprivreda (EP) and strengthen their capacities in financial management/accounting. The project comprises: (a) construction of a 7 million tons per year lignite mine at Tamnava West in Serbia; (b) construction of a 700 MW minehead Thermal Power Plant and auxiliary facilities at Kolubara B site located at the north end of Tamnava West mine field; (c) urgent maintenance/rehabilitation of Thermal Power Plants in Serbia; and (d) technical assistance for: (i) an eight year Power Plant rehabilitation action plan in Serbia aimed at extending the life span and improving the efficiency of power plants including the air quality control facilities; (ii) financial management, accounting and relevant training and cost of service studies for tariff determination and monitoring; (iii) a diagnostic study based development plan and implementation program for the Kolubara area; (iv) restructuring of Serbia's underground mines; and (v) long-term regional air quality monitoring program and training. |
Original sector | Energy and Extractives |
Location
Country | Macedonia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Biomass, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
