logo

Kom Ombo Solar PV Plant

Sector: Commercial • Location: Egypt, Arab Rep.

Source: World Bank Group

Project
Active

The financing will be used for the construction of the Kom Ombo solar project. The plant will be located at Kom Ombo in the Aswan Governate in Egypt. The Kom Ombo solar development was initially envisioned as 10 solar projects, each of 20MW capacity, before being tendered in May 2016 as a single 200MW project.

ACWA Power was selected a preferred bidder to build, own and operate the solar plant.

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Solar
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kom Ombo Solar PV Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kom Ombo Solar PV Plant” is an infrastructure initiative in the Commercial sector, located in Egypt, Arab Rep.. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The financing will be used for the construction of the Kom Ombo solar project. The plant will be located at Kom Ombo in the Aswan Governate in Egypt. The Kom Ombo solar development was initially envisioned as 10 solar projects, each of 20MW capacity, before being tendered in May 2016 as a single 200MW project. ACWA Power was selected a preferred bidder to build, own and operate the solar plant. Total project cost is 154.1 USDm and it was provided by a group of lenders. European Bank for Reconstruction and Development (EBRD) – $36 million Green Climate Fund (GCF) – $23.8 million Arab Bank – $18 million OPEC Fund – $18 million African Development Bank (AfDB) – $17.8 million Financial Closure was achieved in April 2021. Kom Ombo will benefit from a 20-year power purchasing agreement with EETC. It is expected to begin commercial operations in Q3 2022. The government is aiming to increase the share of renewables in the Egyptian energy mix to 22% by 2022 and 42% by 2035. https://ijglobal.com/articles/155124/kom-ombo-solar-pv-egypt https://ijglobal.com/data/transaction/42751?name=Kom%20Ombo%20Solar%20PV%20Plant%20(200MW)&link=%2Farticles%2F155124%2Fkom-ombo-solar-pv-egypt

Original sector

Energy

Budget

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Solar

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project