logo

KOMIPO Wampu SHPP

Sector: Hydro • Location: Indonesia

Source: World Bank Group

Project
Active

Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project.

The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to

Project Information FAQ

Project Information

5 Q
The project “KOMIPO Wampu SHPP” is an infrastructure initiative in the Hydro sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project. The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to Pursahaan Listrik Negara (PT PLN) under a PPA signed in April 2011. The project was to sell power under a 30 year PPA with the state utility PLN. The price of power for the duration of the contract was to be USD 0.0723/kWh. The project required 42km of new transmission lines, developed by the sponsors. EPC contract was awarded to POSCO Engineering & Construction (Formerly known as Daewoo). The project reached financial closure in January 2012, with the Export-Import Bank of Korea (Korea Eximbank) and Sumitomo Mitsui Banking Corporation. The Eximbank provided US$72 million in financing, SMBC provided US$58 million. Total project cost was US$174 million. Tenor was 16 years and 4 months. The project applied for UNFCCC CDM financing. The legal advisor was Norton Rose Group, as well as Milbank, Tweed, Hadley & McCloy LLP. The project holds a business viability guarantee letter (BVGL) from the Ministry of Finance, under 2011 regulations. http://www.nortonrose.com/news/69007/norton-rose-advises-pt-wampu-electric-power-on-45mw-hydro-energy-project-in-north-sumatra-indonesia http://www.projectfinancemagazine.com/Article/3070003/Wampu-hydro-rolls-out-new-PLN-backstop.html http://www.koreaexim.go.kr/en/bbs/noti/view.jsp?no=10124&bbs_code_id=1316753474007&bbs_code_tp=BBS_2

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data