logo

KOMIPO Wampu SHPP

Sector: Hydro • Location: Indonesia

Source: World Bank Group

Project
Active

Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project.

The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KOMIPO Wampu SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KOMIPO Wampu SHPP” is an infrastructure initiative in the Hydro sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project. The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to Pursahaan Listrik Negara (PT PLN) under a PPA signed in April 2011. The project was to sell power under a 30 year PPA with the state utility PLN. The price of power for the duration of the contract was to be USD 0.0723/kWh. The project required 42km of new transmission lines, developed by the sponsors. EPC contract was awarded to POSCO Engineering & Construction (Formerly known as Daewoo). The project reached financial closure in January 2012, with the Export-Import Bank of Korea (Korea Eximbank) and Sumitomo Mitsui Banking Corporation. The Eximbank provided US$72 million in financing, SMBC provided US$58 million. Total project cost was US$174 million. Tenor was 16 years and 4 months. The project applied for UNFCCC CDM financing. The legal advisor was Norton Rose Group, as well as Milbank, Tweed, Hadley & McCloy LLP. The project holds a business viability guarantee letter (BVGL) from the Ministry of Finance, under 2011 regulations. http://www.nortonrose.com/news/69007/norton-rose-advises-pt-wampu-electric-power-on-45mw-hydro-energy-project-in-north-sumatra-indonesia http://www.projectfinancemagazine.com/Article/3070003/Wampu-hydro-rolls-out-new-PLN-backstop.html http://www.koreaexim.go.kr/en/bbs/noti/view.jsp?no=10124&bbs_code_id=1316753474007&bbs_code_tp=BBS_2

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project