KOMIPO Wampu SHPP
Sector: Hydro • Location: Indonesia
Source: World Bank Group
Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project.
The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KOMIPO Wampu SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Korea Midland Power Co., Ltd. (KOMIPO) and POSCO Engineering Co. Ltd. (formerly known as Daewoo Engineering) developed the 45MW Wampu small hydropower plant (run-of-river), Northern Sumatra. PT Mega Power Mandiri reportedly also participated in the project. The plant was to be operated by Wampu Electric Power (project company), for 30 years. Commissioning was expected for 2015. Output was sold to Pursahaan Listrik Negara (PT PLN) under a PPA signed in April 2011. The project was to sell power under a 30 year PPA with the state utility PLN. The price of power for the duration of the contract was to be USD 0.0723/kWh. The project required 42km of new transmission lines, developed by the sponsors. EPC contract was awarded to POSCO Engineering & Construction (Formerly known as Daewoo). The project reached financial closure in January 2012, with the Export-Import Bank of Korea (Korea Eximbank) and Sumitomo Mitsui Banking Corporation. The Eximbank provided US$72 million in financing, SMBC provided US$58 million. Total project cost was US$174 million. Tenor was 16 years and 4 months. The project applied for UNFCCC CDM financing. The legal advisor was Norton Rose Group, as well as Milbank, Tweed, Hadley & McCloy LLP. The project holds a business viability guarantee letter (BVGL) from the Ministry of Finance, under 2011 regulations. http://www.nortonrose.com/news/69007/norton-rose-advises-pt-wampu-electric-power-on-45mw-hydro-energy-project-in-north-sumatra-indonesia http://www.projectfinancemagazine.com/Article/3070003/Wampu-hydro-rolls-out-new-PLN-backstop.html http://www.koreaexim.go.kr/en/bbs/noti/view.jsp?no=10124&bbs_code_id=1316753474007&bbs_code_tp=BBS_2 |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial |
Article published date | 2024-09-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
