logo

Kondhali Telegaon Road Project

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In December 2005, National Highways Authority of India (NHAI) awarded a 20 year concession to Oriental Pathways (Nagpur) Private Limited (OPNPL) to upgrade, finance, operate and maintain the 50 km section on National Highway number six (NH-6) between Kondhali and Telegaon, in Maharashtra State. This project primarily involved strengthening and widening of the existing two lane stretch on NH-6 to a

Status
Prospective
Sector
Road, Hotel, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kondhali Telegaon Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kondhali Telegaon Road Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2005, National Highways Authority of India (NHAI) awarded a 20 year concession to Oriental Pathways (Nagpur) Private Limited (OPNPL) to upgrade, finance, operate and maintain the 50 km section on National Highway number six (NH-6) between Kondhali and Telegaon, in Maharashtra State. This project primarily involved strengthening and widening of the existing two lane stretch on NH-6 to a four lane dual carriageway. The concession term included the construction period of 30 months. The concession agreement between NHAI and OPNPL was signed in March 2006. This road upgrade was part of NHAI’s National Highway Development Project (NHDP) Phase III A. The objective of NHDP Phase IIIA was to widen (four lane) sections of national highways carrying high volume of traffic, connecting state capitals with the NHDP Phases I and II network and providing connectivity to places of economic, commercial and tourist importance. OPNPL, a special purpose company established to implement this project, was jointly owned by Oriental Structural Engineers Private Ltd. and Delhi Brass Consortium. OPNPL won the project in an international competitive tender, conducted by NHAI, by bidding the lowest subsidy. Note that information on the actual subsidy amount (positive or negative) and the ownership structure of OPNPL was not available from public sources. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. However, in high traffic density corridors that are very profitable, the bidders usually offered an upfront payment to NHAI instead of seeking a grant. The total capital cost of the project was estimated at US$ 60.75 million. OPNPL was to be compensated for the capital and operating costs from the tolls collected during the operational period of about 17.5 years. Construction work on the project began in September 2006 and was expected to be completed by March 2009. As per NHAI, the project was completed in March 2009 and is currently operational.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Hotel, Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project