Koohravan Villa / HYPERTEXT ARCHITECTURE STUDIO
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
The adjacency of the mass and soil posed a threat to the light and views of some residential spaces. Therefore, we emptied the mass from the southeast side. The resulting empty space was connected to three existing levels, creating the main staircase of the project at the lower level, the central courtyard at the middle level, and the atrium at the upper level. The dual connection between the step
- Status
- Closed
- Sector
- Cement, Car parking, Residential, Commercial, Automotive
- Location
- Iran
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Koohravan Villa / HYPERTEXT ARCHITECTURE STUDIO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The adjacency of the mass and soil posed a threat to the light and views of some residential spaces. Therefore, we emptied the mass from the southeast side. The resulting empty space was connected to three existing levels, creating the main staircase of the project at the lower level, the central courtyard at the middle level, and the atrium at the upper level. The dual connection between the stepped ground and the structure was established through the continuous intermediate empty space. Based on this duality, we selected stones obtained from excavation for the land material and used scratched white stones for the building material to emphasize the dual nature of the land and structure.In the lower level, the jacuzzi and parking are aligned with the courtyard, while in the middle level, private spaces and the upper floor are designated for public spaces due to privacy concerns and better views. As the required area for spaces on different floors varied and increased from bottom to top, we managed to organize the project plan based on the slope and step excavation of the land.Text description provided by the architects.The site of the project, situated on the slopes of "Zarin Kooh," is adjacent to natural resource lands where construction is prohibited. The steep terrain, combined with our project's plan, led us to organize the mass in terraced layers. For this purpose, the project ground was excavated in a stepped manner into three levels, establishing an optimal balance between excavation volume and the constructed building. The project plan, considering a maximum allowable height of 10.50 meters above ground level, was divided into three floors: ground, first, and second. |
Location
Country | Iran |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Residential, Commercial, Automotive |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in Iran
- Saeed's Boutique Home / Maziar and Colleagues
- Iran Nuclear Sites Reconstruction
- Khondab Heavy-Water Reactor Project
- Aria Residential Building / Pargar Architecture and Design Studio
- Tetra Food Hall / OJAN Design Studio
- Type-less Building Center For Handy Skills / ZAV Architects
- The Gable Villa / Next Office–Alireza Taghaboni
- Green Concrete Production Using Waste from Mobarakeh Steel Company
