logo

Korttailaiyar River Bridges

Sector: Bridge • Location: Tamil Nadu, India

Source: World Bank Group

Project
Active

The Mumbai-based Zoom Developers was awarded the project to rehabilitate an existing 355-meters long bridge, to construct a new 387-meters long bridge and operate both facilities for a 10-year period (the construction works are predicted to last during the first two years of the project). The Karanodai Bridge project will facilitate the link between Chennai and Bangalore, Mumbai, New Delhi and Cal

Project Information FAQ

Project Information

5 Q
The project “Korttailaiyar River Bridges” is an infrastructure initiative in the Bridge sector, located in Tamil Nadu, India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai-based Zoom Developers was awarded the project to rehabilitate an existing 355-meters long bridge, to construct a new 387-meters long bridge and operate both facilities for a 10-year period (the construction works are predicted to last during the first two years of the project). The Karanodai Bridge project will facilitate the link between Chennai and Bangalore, Mumbai, New Delhi and Calcutta. In the first phase of the project, the sponsor will repair and upgrade the existing diversion road, which will be closed once the works on the bridges are concluded. During the second phase of the project, the existing bridge will be repaired (expected completion date: Jul. 2000), while the new bridge will be constructed in the third phase. The project was handed-over in Jan. 1999 and the construction works started in the same month.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data