Korttailaiyar River Bridges
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Mumbai-based Zoom Developers was awarded the project to rehabilitate an existing 355-meters long bridge, to construct a new 387-meters long bridge and operate both facilities for a 10-year period (the construction works are predicted to last during the first two years of the project). The Karanodai Bridge project will facilitate the link between Chennai and Bangalore, Mumbai, New Delhi and Cal
- Status
- Prospective
- Sector
- Bridge, Road, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Korttailaiyar River Bridges
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mumbai-based Zoom Developers was awarded the project to rehabilitate an existing 355-meters long bridge, to construct a new 387-meters long bridge and operate both facilities for a 10-year period (the construction works are predicted to last during the first two years of the project). The Karanodai Bridge project will facilitate the link between Chennai and Bangalore, Mumbai, New Delhi and Calcutta. In the first phase of the project, the sponsor will repair and upgrade the existing diversion road, which will be closed once the works on the bridges are concluded. During the second phase of the project, the existing bridge will be repaired (expected completion date: Jul. 2000), while the new bridge will be constructed in the third phase. The project was handed-over in Jan. 1999 and the construction works started in the same month. |
Original sector | Transport |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Government |
Article published date | 2024-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in India
- Kharar - Ludhiana section of NH - 95 (new NH - 05)
- NK Toll Road Limited
- Mumbai Nasik Expressway Limited
- Nardhana ROB (Railway over Bridge)
- Transstroy Bhopal Berasia Sironj Tollways Private Limited
- MBL (MP) Toll Road Company Limited
- Indore-Edelabad Road
- Soma Isolux Varanasi Aurangabad Tollway Private Limited
