logo

Kosamba Umarpada GC PROJECT

Sector: Road • Location: surat, Gujarat, India

Source: India Investment Grid (IIG)

Project
Tender Award

Information Ministry of Railways- has come up with Kosamba Umarpada GC PROJECT with a ticket size of 467.58 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Tender Award and is being developed through the EPC route. Economic/Social Impact of the Project Kosamba ? Umarpada Section is NG branch line in Vadodara Division of Western Railway. It is iso

Project Information FAQ

Project Information

5 Q
The project “Kosamba Umarpada GC PROJECT” is an infrastructure initiative in the Road sector, located in surat, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

tender award

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Ministry of Railways- has come up with Kosamba Umarpada GC PROJECT with a ticket size of 467.58 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Tender Award and is being developed through the EPC route. Economic/Social Impact of the Project Kosamba ? Umarpada Section is NG branch line in Vadodara Division of Western Railway. It is isolated NG section. Conversion of NG to BG will provide uni-gauge rail system for the local population for journey from Kosamba to Umarpada without break of gauge. Moreover, it is long waited demand of Government of Gujarat and local public and their representatives to provide BG rail link to connect Major Route i.e. Mumbai -Vadodara Section. New connectivity will also make possible for Railway Passengers to have seamless rail journey to Ahmedabad, Delhi, Mumbai and other places by connecting Kosamba - Umarpada by gauge conversion from NG to BG. Kosamba ? Umarpada Existing Narrow gauge is very complicated section in view of conversation of existing NG line to BG line due to very steep grade and sharp curvatures. Proposed BG section will be designed for 110 kmph design speed which is difficult to achieve in the existing alignment. Hence, this proposal is planned to detour section of existing Kosamba Umarpada alignment for proposed BG line by providing smooth curves and flatter grade. This railway line will help in rapid socio-economic development in cities of Kosamba Umarpada and all the cities that lie between and surrounding them.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data