logo
ProjectTender Award

Kosamba Umarpada GC PROJECT

Sector: Road • Location: surat, Gujarat, India

Source: India Investment Grid (IIG)

Information Ministry of Railways- has come up with Kosamba Umarpada GC PROJECT with a ticket size of 467.58 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Tender Award and is being developed through the EPC route. Economic/Social Impact of the Project Kosamba ? Umarpada Section is NG branch line in Vadodara Division of Western Railway. It is iso

Status
Under Construction
Sector
Road, Rail, Government, Mass Transit
Location
surat, Gujarat, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Kosamba Umarpada GC PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kosamba Umarpada GC PROJECT” is an infrastructure initiative in the Road sector, located in surat, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

tender award

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Ministry of Railways- has come up with Kosamba Umarpada GC PROJECT with a ticket size of 467.58 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Tender Award and is being developed through the EPC route. Economic/Social Impact of the Project Kosamba ? Umarpada Section is NG branch line in Vadodara Division of Western Railway. It is isolated NG section. Conversion of NG to BG will provide uni-gauge rail system for the local population for journey from Kosamba to Umarpada without break of gauge. Moreover, it is long waited demand of Government of Gujarat and local public and their representatives to provide BG rail link to connect Major Route i.e. Mumbai -Vadodara Section. New connectivity will also make possible for Railway Passengers to have seamless rail journey to Ahmedabad, Delhi, Mumbai and other places by connecting Kosamba - Umarpada by gauge conversion from NG to BG. Kosamba ? Umarpada Existing Narrow gauge is very complicated section in view of conversation of existing NG line to BG line due to very steep grade and sharp curvatures. Proposed BG section will be designed for 110 kmph design speed which is difficult to achieve in the existing alignment. Hence, this proposal is planned to detour section of existing Kosamba Umarpada alignment for proposed BG line by providing smooth curves and flatter grade. This railway line will help in rapid socio-economic development in cities of Kosamba Umarpada and all the cities that lie between and surrounding them.

Original sector

Railways

Procurement method

Budget

Location

Country

India

State

Gujarat

City

surat

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Road, Rail, Government, Mass Transit

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project