Kosharevo Solar Plant
Sector: Solar • Location: Bulgaria
Source: World Bank Group
Gehrlicher Solar AG was planning the expansion of its existing 1.2 MW Kosharevo solar PV plant to 3 MW. The project was owned and operated by Bulgarian investor group GSG Studena ood.
The first 1.2 MW of the project was completed in July 2011, and was expected to be connected to the grid promptly. The project was to receive feed-in tariffs for its production at 35.75 cents per kWh.
As of Octob
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Government, Commercial
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kosharevo Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gehrlicher Solar AG was planning the expansion of its existing 1.2 MW Kosharevo solar PV plant to 3 MW. The project was owned and operated by Bulgarian investor group GSG Studena ood. The first 1.2 MW of the project was completed in July 2011, and was expected to be connected to the grid promptly. The project was to receive feed-in tariffs for its production at 35.75 cents per kWh. As of October 2011, no details about the financial structure of the project were available. |
Original sector | Energy |
Budget |
Location
Country | Bulgaria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
