Kosi Bridge Construction Project
Sector: Bridge • Location: Supaul, Bihar, India
Source: India Investment Grid (IIG)
Information Ministry of Railways has come up with Kosi Bridge Construction Project with a ticket size of 516.02 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridge . The current status of the project is KOSHI Bridge -39 x 45.7m- is physically completed. Bridge No. 5 & 7 -OWG-had suffered during heavy floods ,their return walls got tilted & settled. .Scheme for
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Ministry of Railways has come up with Kosi Bridge Construction Project with a ticket size of 516.02 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridge . The current status of the project is KOSHI Bridge -39 x 45.7m- is physically completed. Bridge No. 5 & 7 -OWG-had suffered during heavy floods ,their return walls got tilted & settled. .Scheme for temporary commissioning of bridges has been approved and rehabilitation work is completed. Now, it has been decided to first run traffic on existing bridges under speed restriction in Phase -I. In Phase- II, both the bridges No. 5 & 7 of span 2x45.7m OWG on well foundation each on independent diversion will be constructed.and is being developed through the contractual route. Economic/Social Impact of the Project This will give an alternate route all around the Nepal border. Right now, trains from the Northeast have to come down to Katihar and Malda to go anywhere in the country through what is called the ?chicken neck?. So it will also ease congestion in the ?chicken neck?,? said a senior railway official. The bridge will enable the opening up of the route through Darbhanga, Nirmali and finally to New Jalpaiguri from where the route to Assam starts. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in India
- Supreme Panvel Indapur Tollways Private Limited
- Howrah Bridge
- Chenani-Nashri Tunnel (Patnitop Tunnel), India
- Chennai Outer Ring Road (ORR), Tamil Nadu, India
- Nagpur City Ring Road Package I
- Kochi LNG Terminal
- Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I)
- Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand
