logo
ProjectPipeline

Kosovo Renewable Energy Preparation Support

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

This small grant project in a recipient-executed (RE) structure will carry out preparatory technical studies (including geotechnical, seismic, hydrological assessments), a wind measurement campaign, and a preliminary Environmental and Social Impact Assessment (ESIA) for potential wind power development on two sites in Kosovo (with an expected combined capacity of 200MW). These technical studies, t

Status
Prospective
Sector
Power Generation (CCGT), Warehouse, Wind, Government
Location
Kosovo
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kosovo Renewable Energy Preparation Support

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kosovo Renewable Energy Preparation Support” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kosovo. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This small grant project in a recipient-executed (RE) structure will carry out preparatory technical studies (including geotechnical, seismic, hydrological assessments), a wind measurement campaign, and a preliminary Environmental and Social Impact Assessment (ESIA) for potential wind power development on two sites in Kosovo (with an expected combined capacity of 200MW). These technical studies, terms of reference, work plans or other documents defining the scope and outputs of technical assistance activities will be drafted so that the advice and other support provided is consistent with World Bank Environmental and Social Framework. As the sites will be prepared for development by private companies, the documentation will comply with the standards required by high-quality investors. In addition, the proposed activity will (i) enhance the capacity of the line ministry (Ministry of Economy) to prepare additional wind energy projects; and (ii) support project preparation costs. The project is expected to be funded by an Energy Sector Management Assistance Program (ESMAP) grant. The RE project is integral part of a comprehensive TA program that aims to facilitate the preparation of a competitive tendering process for RE development in Kosovo. A complementary Bank-executed (BE) activity will be linked to this project, also funded by ESMAP. The BE part supplements the RE project by implementing early preparation studies, including logistics and topographic surveys, which in turn are procured under a World Bank global framework contract. The division of technical work between the RE and BE components was agreed with ESMAP and corporate procurement. The deliverables and budget only concern the RE components.

Original sector

Energy and Mineral Resources

Location

Country

Kosovo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Warehouse, Wind, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project