logo

Kotakatta Kurnool Road Project

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In March 2006, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Andhra Pradesh Expressway Limited (APEL) to upgrade, finance, operate and maintain the Kotakatta-Kurnool section on National Highway number seven (NH-7), in Andhra Pradesh state. This project primarily involved strengthening and widening of the existing two lane 74 km stretch on NH-7 to a four la

Project Information FAQ

Project Information

4 Q
The project “Kotakatta Kurnool Road Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2006, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Andhra Pradesh Expressway Limited (APEL) to upgrade, finance, operate and maintain the Kotakatta-Kurnool section on National Highway number seven (NH-7), in Andhra Pradesh state. This project primarily involved strengthening and widening of the existing two lane 74 km stretch on NH-7 to a four lane divided expressway. The concession term included a construction period of 30 months. APEL, a special purpose company established to implement this project, was a fully owned subsidiary of Infrastructure Leasing & Financial Services Limited (IL&FS). APEL won the project in an international competitive tender, conducted by NHAI, by bidding the lowest annuity amount of US$ 12.5 million. Under the concession, APEL was compensated for the capital costs and operating costs including returns by way of a fixed semi annual payment (annuity) of US$ 12.5 million from the NHAI during the operational period of 15 years. Under the annuity scheme, the private operator (APEL) cannot collect tolls from the users of the facility. The total capital cost of the project was estimated at US$ 164.4 million. The project reached financial close in April 2006. Construction work on the project began in September 2006 and was expected to be completed by March 2009. APEL appointed KMC Construction Limited for the construction works contract (EPC) and ITNL (IL&FS Transportation Networks Limited) for the operation and maintenance (O&M) of the project. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data