Kouvola Lakiasuo PV plant

Sector: Power Transmission • Location: Finland

Source: EU Funding & Tenders Portal

Project
Ongoing

Fu-Gen Energia VII Oy, a subsidiary of Fu-Gen, an independent power producer focused on long-term ownership of renewable energy assets developed in close collaboration with local communities to align projects with environmental and regional needs across the Nordics. Fu-Gen Energia VII Oy is planning the construction of a utility-scale solar power plant in Kouvola, on the Lakiasuo peat production a

Project Information FAQ

Project Information

3 Q
The project “Kouvola Lakiasuo PV plant” is an infrastructure initiative in the Power Transmission sector, located in Finland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Fu-Gen Energia VII Oy, a subsidiary of Fu-Gen, an independent power producer focused on long-term ownership of renewable energy assets developed in close collaboration with local communities to align projects with environmental and regional needs across the Nordics. Fu-Gen Energia VII Oy is planning the construction of a utility-scale solar power plant in Kouvola, on the Lakiasuo peat production area. Peat extraction at the site is expected to conclude end in the summer of 2025, after which the land will be repurposed for renewable energy generation. The project area covers approximately 150 hectares and is located about 30 kilometers southeast of Kouvola city center. The planned capacity of the solar power plant is 80 MWp. Once operational, it is expected to generate enough electricity annually to meet the consumption needs of approximately around 50,000 typical two-bedroom apartments. The project will utilize the latest bifacial solar panel technology, which captures sunlight from both sides of the panel to maximize energy yield. The project is currently in a planning stage, with permitting progressing well. Pre-construction works are scheduled to begin by Q4/2025 at the latest, and the solar park is expected to be commissioned by March 2027.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data