KOYNA POWER II
Sector: Water Supply and Storage • Location: India
Source: World Bank Group
The Second Koyna Hydroelectric Project in India will provide financing for the hydroelectric project, south east of Bombay in the state of Maharashtra. The Koyna development will be carried out in three stages: Stage I, will provide capacity of 240 MW; Stage II, will add 340 MW; and Stage III, will provide 100 MW in a tailwater plant. This project will consists of: (a) raising the height of the da
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Metal, Steel, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KOYNA POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Koyna Hydroelectric Project in India will provide financing for the hydroelectric project, south east of Bombay in the state of Maharashtra. The Koyna development will be carried out in three stages: Stage I, will provide capacity of 240 MW; Stage II, will add 340 MW; and Stage III, will provide 100 MW in a tailwater plant. This project will consists of: (a) raising the height of the dam from elevation 2, 107 feet to its designed height of 2,180 feet; (b) completing the Koyna underground power station and installing four 75 MW Pelton type turbo-generating sets with transformer equipment, (c) constructing a small power station at the base of Koyna dam with two Kaplan type turbo - generating units of 20 MW each; (d) expanding the 220k switchyard; (e) constructing a 45 mile 220 kv double circuit line to the site of a new aluminum factory to be located at Jaigad; and (f) supplementing the transmission capacity toward Bombay. The demand for electricity in the Bombay-Poona area warrants substantial additions to generating capacity of the system serving this area as soon as possible. The completion of the second Stage of the Koyna development is the quickest and most economical method of providing this additional capacity. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Metal, Steel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
