logo

KOYNA POWER II

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Closed

The Second Koyna Hydroelectric Project in India will provide financing for the hydroelectric project, south east of Bombay in the state of Maharashtra. The Koyna development will be carried out in three stages: Stage I, will provide capacity of 240 MW; Stage II, will add 340 MW; and Stage III, will provide 100 MW in a tailwater plant. This project will consists of: (a) raising the height of the da

Project Information FAQ

Project Information

5 Q
The project “KOYNA POWER II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Koyna Hydroelectric Project in India will provide financing for the hydroelectric project, south east of Bombay in the state of Maharashtra. The Koyna development will be carried out in three stages: Stage I, will provide capacity of 240 MW; Stage II, will add 340 MW; and Stage III, will provide 100 MW in a tailwater plant. This project will consists of: (a) raising the height of the dam from elevation 2, 107 feet to its designed height of 2,180 feet; (b) completing the Koyna underground power station and installing four 75 MW Pelton type turbo-generating sets with transformer equipment, (c) constructing a small power station at the base of Koyna dam with two Kaplan type turbo - generating units of 20 MW each; (d) expanding the 220k switchyard; (e) constructing a 45 mile 220 kv double circuit line to the site of a new aluminum factory to be located at Jaigad; and (f) supplementing the transmission capacity toward Bombay. The demand for electricity in the Bombay-Poona area warrants substantial additions to generating capacity of the system serving this area as soon as possible. The completion of the second Stage of the Koyna development is the quickest and most economical method of providing this additional capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data