Koysha Dam
Under construction · Ethiopia · Last reported Sep 2025
Source: Addis Insight
Koysha Dam is under construction since 2016 on the Omo river system as the fourth dam in the cascade for hydropower generation. It is planned to have a capacity of 2,160 MW from eight Francis units and features a ~180 m RCC gravity dam. The project is approximately 60–65% complete but faces severe cost overruns (~151%) and foreign exchange constraints, leading Ethiopia to seek exceptional commerci
- Status
- Under Construction
- Sector
- Hydro, Commercial, Water Supply and Storage
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- Addis Insight
ConstructChat
Ask ConstructChat about Koysha Dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Koysha Dam is under construction since 2016 on the Omo river system as the fourth dam in the cascade for hydropower generation. It is planned to have a capacity of 2,160 MW from eight Francis units and features a ~180 m RCC gravity dam. The project is approximately 60–65% complete but faces severe cost overruns (~151%) and foreign exchange constraints, leading Ethiopia to seek exceptional commercial borrowing and stressing the debt-fueled model. |
Original sector | Energy |
Location
Country | Ethiopia |
Source
Source | Addis Insight |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Water Supply and Storage |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
