logo

Kozhukhovo Power Plant

Sector: Wind • Location: Russian Federation

Source: World Bank Group

Project
Active

In 2005, a joint venture between Turkish Zorlu Enerji (51%) and U.S. Invar International, Inc (49%) won a tender to build one of the first private power plants near Moscow. The Moscow Government held closed bidding for the leasing of construction sites for four heat and power plants in new districts of the capital – Kozhukhovo, Severny, Molzhaninovka, Tereshkovo for a period of 49 years.

Zor

Project Information FAQ

Project Information

4 Q
The project “Kozhukhovo Power Plant” is an infrastructure initiative in the Wind sector, located in Russian Federation. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2005, a joint venture between Turkish Zorlu Enerji (51%) and U.S. Invar International, Inc (49%) won a tender to build one of the first private power plants near Moscow. The Moscow Government held closed bidding for the leasing of construction sites for four heat and power plants in new districts of the capital – Kozhukhovo, Severny, Molzhaninovka, Tereshkovo for a period of 49 years. Zorlu Enerji and Invar International through their joint venture, ICFS International, won rights to build two gas turbine power stations in Tereshkovo and Kozhukhovo. ICFS International would build and operate the Kozhukhovo power plant that would supply electricity and heat to residents of Kozhukhovo district. The design capacity of the power plant would be 340MW and the project would cost US$500 million. The power station would run on natural gas. The construction of the plant began in 2007. The Moscow Government was to buy all energy generated by the new plant at rates established by the Moscow Committee on Energy Tariffs. Therefore, consumer will be paying for privately generated electricity and heat at the established tariff. According to the Moscow government, it had to lease district power plants to private investors, because MOSENERGO, the local power company, could not cope with the annual 3-4% rise in energy consumption in Moscow, while limited capacities of power grids make it impossible to transport electricity from other regions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data