In 2010, the Kribi Power Plant BOT project reached closure with the completion of more than 25% of plant's construction. Apart from the 216MW plant, the project also consists of a 100km 225 kilovolt double circuit transmission line.

The project was awarded by AES Sonel, the national utility, to the private company Kribi Power Development Company. Kribi Power Development Company was a joint ventur

Status
Prospective
Sector
Government, Power Generation (CCGT), Residential, Power Transmission, Natural Gas, Commercial
Location
Cameroon
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kribi Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kribi Power Plant” is an infrastructure initiative in the Government sector, located in Cameroon. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2010, the Kribi Power Plant BOT project reached closure with the completion of more than 25% of plant's construction. Apart from the 216MW plant, the project also consists of a 100km 225 kilovolt double circuit transmission line. The project was awarded by AES Sonel, the national utility, to the private company Kribi Power Development Company. Kribi Power Development Company was a joint venture between AES (56%) and the government (44%). Kribi Power Development Company had a 20-year PPA with the national utility AES Sonel. Wartsila was selected to supply and install the gas engine power plant. In April 2011, construction was 43% complete but it was reported that Kribi Power Development Company was still looking for $132.9 million to complete the project. Construction was expected to be completed by June 2012. On July 19, 2011, the African Development Bank (AfDB) approved a loan of $57 million (€45 million) toward the construction of the plant. In January 2012, KPDC announced a project financing of $329.7 million in total (€258 million). $76.7 million was to be provided by the International Finance Corporation (IFC - €60 million), and the Standard Chartered Bank providing the same amount. Another $176.35 million (€138 million) was provided by the AfDB, the Netherlands Development Finance Company (FMO, $23 million or €16.5 million), the French Promotion and Investment Company for Economic Cooperation (PROPARCO), and the Central African Development Bank (BDEAC). The European Investment Bank announced in January 2012 that it also contributed to the financing for the project, providing $41 million (€29.5 million). Completion expected by september 2012. Commissioning expected soon after completion.

Original sector

Energy

Budget

Location

Country

Cameroon

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Residential, Power Transmission, Natural Gas, Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project