Kribi Power Plant

Sector: Natural Gas • Location: Cameroon

Source: World Bank Group

Project
Active

In 2010, the Kribi Power Plant BOT project reached closure with the completion of more than 25% of plant's construction. Apart from the 216MW plant, the project also consists of a 100km 225 kilovolt double circuit transmission line.

The project was awarded by AES Sonel, the national utility, to the private company Kribi Power Development Company. Kribi Power Development Company was a joint ventur

Project Information FAQ

Project Information

5 Q
The project “Kribi Power Plant” is an infrastructure initiative in the Natural Gas sector, located in Cameroon. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2010, the Kribi Power Plant BOT project reached closure with the completion of more than 25% of plant's construction. Apart from the 216MW plant, the project also consists of a 100km 225 kilovolt double circuit transmission line. The project was awarded by AES Sonel, the national utility, to the private company Kribi Power Development Company. Kribi Power Development Company was a joint venture between AES (56%) and the government (44%). Kribi Power Development Company had a 20-year PPA with the national utility AES Sonel. Wartsila was selected to supply and install the gas engine power plant. In April 2011, construction was 43% complete but it was reported that Kribi Power Development Company was still looking for $132.9 million to complete the project. Construction was expected to be completed by June 2012. On July 19, 2011, the African Development Bank (AfDB) approved a loan of $57 million (€45 million) toward the construction of the plant. In January 2012, KPDC announced a project financing of $329.7 million in total (€258 million). $76.7 million was to be provided by the International Finance Corporation (IFC - €60 million), and the Standard Chartered Bank providing the same amount. Another $176.35 million (€138 million) was provided by the AfDB, the Netherlands Development Finance Company (FMO, $23 million or €16.5 million), the French Promotion and Investment Company for Economic Cooperation (PROPARCO), and the Central African Development Bank (BDEAC). The European Investment Bank announced in January 2012 that it also contributed to the financing for the project, providing $41 million (€29.5 million). Completion expected by september 2012. Commissioning expected soon after completion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data