logo

Kribi

Sector: Oil and Gas • Location: Cameroon

Source: International Finance Corporation (IFC)

Project
Completed

IFC proposes to invest up to Euros 35 million in Kribi Power Development Company (KPDC or the company) for the development of a gas-fired power plant with a gross capacity of 216 MW and the associated 100 km 225 kV double circuit transmission line from Kribi to Edéa (Kribi) in Cameroon. KPDC is an affiliate of AES Sonel, the privatized integrated electric utility of Cameroon and an IFC investee c

Project Information FAQ

Project Information

5 Q
The project “Kribi” is an infrastructure initiative in the Oil and Gas sector, located in Cameroon. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC proposes to invest up to Euros 35 million in Kribi Power Development Company (KPDC or the company) for the development of a gas-fired power plant with a gross capacity of 216 MW and the associated 100 km 225 kV double circuit transmission line from Kribi to Edéa (Kribi) in Cameroon. KPDC is an affiliate of AES Sonel, the privatized integrated electric utility of Cameroon and an IFC investee company. AES Sonel will also be the off-taker of the power produced by KPDC. The Kribi project will be Cameroon’s second Independent Power Project (IPP) after the Dibamba power plant. Gas will be supplied to Kribi from the Sanaga Sud gas project being developed by Perenco in partnership with Société Nationale des Hydrocarbures (SNH: the national petroleum company). Although the Sanaga Sud gas facility is not funded as part of the project, Kribi is expected to be the main gas offtaker at least during initial years of operation, and reliable supply of gas is important for optimal operation of Kribi. The main objectives of the project are to meet the increasing demand for power in the country and to diversify Cameroon’s current mostly hydro generation capacity through thermal generation expansion while displacing inefficient thermal power plants thereby reducing environmental impact, including carbon emissions. This project was first disclosed on February 20, 2008 and due to changes in the project size and scope a new disclosure had to be done.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data